Crossref Citations
This article has been cited by the following publications. This list is generated based on data provided by Crossref.
Riesener, M.
Kuhn, M.
Keuper, A.
Lauf, H.
Solanki, N.
and
Schuh, G.
2023.
Methodology to Determine the Cost of Delay in Projects to Improve Project Prioritization.
p.
1.
Riesener, Michael
Kuhn, Maximilian
Keuper, Alexander
and
Schuh, Guenther
2023.
A literature analysis on success factors and their corresponding scientific approaches in multi-project management.
Procedia CIRP,
Vol. 119,
Issue. ,
p.
1176.
Keuper, A.
Kuhn, M.
Riesener, M.
and
Schuh, G.
2023.
Production at the Leading Edge of Technology.
p.
717.